Selected references


Plant design and supervision of construction

Complete list of references 
Company presentation including selected references 
Mechanical waste treatment

2018

 

Oswald Hackl e.U

Wulkaprodersdorf/A
 

Invest and plant cost estimate

Preparation of tender documents for a mechanical sorting plant for commercial waste including recovery of recyclable materials for metals, plastic and paper

Assistance of the purchase negotiation and contract design


 
 

 

 

Mayer recycling GmbH

St.Michael/A
 

Preparation of a complete facility concept for the rebuilding of the mechanical fuel and sorting plant after a fire

development of a concept for the plant according to customer requirements and state of the art

Preparation of tener documents

Creation of a restructuring plan including presentation of a transitional operation for a temporary permit of a bridging plant after a fire according to a EIA-law waste treatment plant


 
 

 

 

Griffin Refineries Oy

Helsinki/FI
 

Trial operation (test run) at a waste treatment plant in Chile

Preparation of a report with improvement measures for the plant


 
 

 

 

Fortum Waste Solutions

FI
 

Pre-planning of a plastics recycling center for 20.000 t/a of separately collected plastic waste in Norway consisting of an automatic sorting system as well as washing and extrusion lines for flat and bodily plastic fractions


 
 

 

 

Holding Graz Services Abteilung Abfall

Graz/A
 

Preparation of procurement documents and purchasing negotiations for changes to logistics for the removal of waste from mechanical waste treatment plant


 
 

2017

 

Zuser Ressourcen-management GmbH

Peggau/A
 

Approval planning according to the Waste Management Act for extension and new construction for waste depots. Approval planning according to the Waste Management Act for the reconstruction of a treatment plant after a fire.


 
 

 

 

Holding Graz Services Abteilung Abfall

Graz/A
 

Approval planning according to the Waste Management Act for modifications of the logistics for the removal of waste from a mechanical waste treatment plant


 
 

 

 

Oswald Hackl e.U.

Wulkaprodersdorf/A
 

Assistance in the rebuilding of a mechanical sorting plant after a fire. Concepts for adaptation to the state of the art as well as evaluation of possible new technologies to increase added value.


 
 

 

 

Mayer Recycling

St.Michael in der Obersteiermark/A
 

Digitizing several existing mechanical plants and creating detailed 3D models. Concepts for upgrading sorting machines to increase added value.


 
 

 

 

Riikinvoima W2E Andritz

Oy/FI
 

Project management for the construction and run of mechanical fuel treatment for a fluidized bed boiler. Acceptance and performance test of the individual machines and the entire plant. Assistance in running the plant by order of Andritz,coordination of service and maintenance work. Elaboration of maintenance concepts, support in the creation of the whole plant documenation.


 
 

2016

 

Zuser Ressourcen-management GmbH

Peggau/A
 

Support with the processing of an official environmental inspection
Approval planning according to the Waste Management Act for changes to the types of waste and the storage concept
Approval planning according to the Waste Management Act for the construction of a waste collection center


 
 

 

 

Augusta Buntmetalle GmbH

Lannach bei Graz/A
 

Approval documents and support of the approval procedure for the entire plant location


 
 

 

 

SKAPA Recycling GmbH

Kottingbrunn/A
 

Preparation of permitting documents according to §74 industrial law and support of the approval procedures for the expansion of the plant of various metal waste, total capacity 20000 t/a


 
 

 

 

Ekokem Corporation/FI

 

Supporting project management and assistance during the commissioning and trial period for a splitting plant for 100,000 t/a of MSW and an automatically sorting plant for up to 10,000 t/a of separately collected packaging waste in Finland


 
 

 

 

Holding Graz Services Abfallwirtschaft

Graz/A
 

Concept planning and investment cost estimate for the optimization of the logistics system of the domestic waste treatment plant

Concept planning and investment cost estimate for the pre-sorting of bulky waste

 
 

 

 

Riikinvoima W2E Andritz Oy/Fl

 

Implementation of different factory acceptance tests (FAT). Logic description of the whole plant control and dry run of the control. Final and detailed plans, local site supervision and project coordination. Commissioning of the waste treatment plant.

 
 

2015

 

KAB Kärntner Abfallbewirtschaftung GmbH

Klagenfurt/A
 

Design, approval planning according to the Waste Management Act and compilation of specifications for the construction of a mechanical sorting plant and storage facilities for commercial waste for 34,900 t/a

Design, approval planning according to the Waste Management Act for storage facilities, washing area and gas station, Waste storage concept and surface drainage for the whole site of KAB in Klagenfurt

 
 

 

 

SAB Salzburger Abfallbeseitigung GmbH

Bergheim/A
 

Design and appoval planning according to the Waste Management Act, Preparation of tender documents according to the law and construction supervision for the reconstruction of a sorting system for packaging waste

 
 

 

 

Customer does not want to be named

 

Design, tender elaboration, call for tenders, tender evaluation and support during purchase for an automatically sorting plant for up to 10,000 t/a of separately collected packaging waste in Finland

 
 

2014

 

Andritz Oy/FI

 

Design, tender elaboration, call for tenders, tender evaluation, support during the purchase phase and supervision during the detail engineering phase of the suppliers for a mechanical waste treatment plant in front of a fluidized bed incinerator with an annual capacity of 145,000 tons of predominantly municipal solid waste

 
 

 

 

ecovalor

Campulung/RO
 

Technical support during the commissioning period of a treatment plant for solid recovered fuel in Campulung/Romania

 
 

 

 

Strabag Umweltanlagen GmbH

Dresden/D
 

Design planning for the mechanical treatment and substitute fuel production of a MBT for 160,000 t/a in Limassol/Cyprus

 
 

2013

 

Andritz Energy & Environment GmbH

 

Basic design of a treatment plant for 75.000 t/a of waste, which should be located in front of a fluidized bed burner

Call for tenders, elaboration of the investment and operational costs and preparation of a 3D-model
 
 

 

 

AWV Hartberg/A

 

Detailed planning, compilation of specifications and conducting of procurement procedures according to the Austrian Federal Public Procurement Law for the reconstruction of a mechanical treatment plant with a capacity of 15,000 tons/Year

 
 

2012

 

Holcim (Slovensko) a.s.

Rohoznik/SK
 

Concept for a modular development of decentral waste treatment plants

Preparation of a calculation model considering different input quantities, input compositions and different plant configurations, etc

Elaboration of 3D-models and calculation of the investment and operational costs for the different plant configurations
 
 

 

 

Ekokem Oy Ab
Riihimäki/FI

 

Conceptual and tender design for a mechanical Pre-treatment plant for MSW, an automatic sorting plant for the separated and separately collected plastic fractions and pulper units for the separated organics and paper fractions for a site in Turku/FI

Comparison of the received offers and elaboration of a evaluation report
 
 

 

 

Saubermacher AG

Graz/A
 

System analysis, Compilation of specifications and handling of the procurement procedure, supervision, accompaniment of the commissioning process and acceptance of an after-treatment-plant (fine processing and sorting) for pretreated  electronic scrap

 
 

 

 

Paperinkeräys
Oy/FI

 

Creation of a site development concept and implementation of technical facilities for a paper sorting plant including a transfer station for biogenic waste, a sorting plant for electronic scrap and a document destruction plant with a capacity of 100,000 t/a

 
 

 

 

AWV
Hartberg/A

 

Approval project and accompaniment during the process according to the Austrian Waste Management Act for rebuilding a sorting plant for residual and packaging waste with a capacity of 12,000 t/a

 
 

 

 

Anton Mayer Ges.m.b.H

St. Michael/A
 

Pre-design and draft planning for the construction of a homogenization plant for substitute fuel with a capacity of 125,000 t/a

 
 

2011

 

KAB Kärntner
Abfallbewirtschaftung GmbH
Klagenfurt/A

 

Pre-design and draft planning, approval planning according to the Austrian Waste Management Act and compilation of specifications for the construction of a mechanical sorting plant for commercial wastes and packaging wastes with a capacity of 34,500 t/a

 
 

 

 

Ekokem Oy Ab
Rki/FI

 

Compilation of specifications for a mechanical treatment plant destined to extract fuel and a fine fraction rich in organic substances from various waste streams; capacity of 100,000 t/a

 
 

 

 

Zuser Umweltservice GmbH
Peggau/A

 

Approval planning according to the Austrian Waste Management Act for several adaptions of an existing waste treatment plant with a capacity of 159,500 t/a

 
 

 

 

Gaugl Metallhandel GmbH

Tiefenbach bei Kaindorf/A
 

Compilation of specifications, handling of the procurement procedure, construction supervision and overall project coordination for the construction of a metal- and scrap waste treatment plant with associated secondary plants, a scrap car drainage plant, a scrap car disassembly plant and a transshipment station for various dry waste streams; overall capacity of 35,000 t/a

 
 

2010

 

ThermoTeam
Alternativbrennstoffverwertungs GmbH

Graz/A
 

Approval planning for various adaptations of the existing plant according to the Austrian Waste Management Act and permission for an increase in the allowed annual troughput from 90,000 t/a to 99,500 t/a

 
 
    Ekokem Oy Ab
Riihimäki/Finnland
  Pre-design planning for the construction of a mechanical treatment plant for extraction of fuel and recyclable waste material from different waste streams with a capacity of 35,000 t/a  
 
   

AE&E Austrian
Energy & Environment
Graz/A

 

Leadership of the setting-up operation and the test run of a SRF-treatment plant for the application in a fluidized bed combustion, capacity: 75 t/h in Schwedt, Germany

 
 
   

Saubermacher
Dienstleistungs AG
Graz/A

 

Compilation of specifications, handling of the award of contracts and construction supervision of a treatment plant for waste electric appliance and polluted scrap for 20,000 t/a

 
 

2009

 

Müllex Umwelt-Säuberung GmbH

St. Margarethen an der Raab/A
 

Approval planning according to the Austrian Waste Management Act for several adaptions of a waste treatment plant, capacity 80,000 t/a

 
 

 

  Saubermacher Dienstleistungs AG
Unterpremstätten/A
 

Pre-design and approval planning according to the Austrian Waste Management Act, compilation of specifications, handling of the award of contracts and supervision of the construction for a treatment plant of garage wastes, capacity 15,000 t/a

Pre-design and approval planning according to the Austrian Waste Management Act for the construction of a treatment plant of electrical waste, capacity 20,000 t/a

 
 

 

 

Gaugl Metallhandel GmbH
Schönau/A

 

Approval planning according to the Austrian Waste Management Act for the construction of a scrap waste treatment plant incl. associated secondary plants, dissambly of old cars and a reloading station for demolition and construction waste, capacity 35,000 t/a

 
 

 

 

WKU Wiener Kommunal-
Umweltschutzprojekte GmbH
Vienna/A

 

Compilation of specifications and handling of the award of contracts for the construction of a waste logistics center for residual waste of the City Vienna, consisting of a mechanical treatment plant and a baling storage with a capacity of 2,600 t/d

 
 

2008

 

WKU Wiener Kommunal-
Umweltschutzprojekte GmbH
Vienna/A

 

Pre-design and technical approval documents according to the Austrian Environmental Impact Assessment Act (UVP) for a waste logistic center of residual waste of the city Vienna, (consisting of a mechanical treatment plant with 130 t/h and a bale storage with capacity of 2,600 t/d)

 
 

 

 

Josef Buchhauser
Voitsberg/A

 

Approval planning for a waste treatment center, consisting of a reloading station, an intermediate storage and a mechanical waste sorting plant, capacity 30,000 t/a

 
 

 

 

Abfallwirtschaftsverband Lavanttal
Lavamünd/A

 

Compilation of specifications, handling of the award of contracts and supervison of the construction of a reloading station for wastes and a regional center for recyclable wastes

 
 

 

 

AE&E Austrian Energy & Environment
Graz/A

 

Pre-design for a treatment plant of solid recovered fuel (SRF) for the input into an atmospheric fluidized bed combustion, capacity 75 t/h in Leipa/Germany
in cooperation with company Envicare

 
 

2007

  Müllex Umwelt Säuberung GmbH
St. Margarethen an der Raab/A
 

Approval planning according to the Austria Waste Management Act, compilation of specifications, handling of the award of contracts and assistance in supervision for the rebuilding of a splitting plant for commercial waste , capacity 70,000 t/a

 
 

 

  Bakonyi Eomü Részvénytáraság
Ajka/HU
  Pre-design, compilation of specifications, handling of the call for tenders, award of contracts for the construction of conveyor, storage and dosing systems of solid recovered fuels of wastes for feeding a fluidized bed combustion, capacity 150,000 t/a  
 

 

 

Fernwärme Wien GmbH
Vienna/A

 

Approval planning for a reconstruction of the slag output system of rotary kiln, capacity 20,000 t/a

 
 

 

  EWB Entsorgungswirtschaft am Bodensee GmbH
Lustenau/A
  Pre-design, approval planning according to the Waste Management Act, compilation of specifications, handling of the call for tenders, award of contracts and supervision of construction for a sorting plant of packaging and plastic waste of commercial waste in Lustenau, capacity 42,000 t/a  
 

2006

 

ZUMA
BeteiligungsgesmbH & Co
Abfallstoffverwertungs KG
Vienna/A

 

Approval planning according to the Waste Management Act for a reloading station of wastes with mechanical treatment, capacity 90,000 t/a

 
 

 

  Hubert Häusle GmbH
Lustenau/A
  Approval procedure according to the Austrian Environmental Impact Assessment Act for a waste treatment plant, capacity 150,000 t/a  
 

 

 

Abfallwirtschaftsverband Liezen
Liezen/A

 

Compilation of specifications, handling of the call for tenders, award of contracts and supervision of the extension of a mechanical treatment plant, capacity 25,000 t/a

 
 

 

 

Holcim (Bulgaria) AD
Beli Izvor/BG

  Pre-design, compilation of specifications, handling of the call for tenders, award of contracts and supervision of construction for a solid recovered fuel (SRF)-treatment incl. a intermediate storage and feeding into the thermal treatment process in the cement plant, capacity 20,000 t/a  
 

 

  Saubermacher Dienstleistungs AG
Graz/A
  Pre-design and approval planning, compilation of specifications, handling of the call for tenders, award of contracts and supervision of construction for a mechanical waste treatment plant with an automatic sorting system for packaging waste, paper and commercial waste with a capacity of 50,000 t/a  
 

2005

 

W&P Wietersdorfer & Peggauer Zementwerke GmbH
Klein St. Paul/A

 

Detail planning of SRF-treatment plant with intermediate bunker, call for tenders and awards of contracts, capacity 55,000 t/a

 
 

 

 

WAV Betriebsführung GmbH
Wels/A

 

Detailplanning of SRF-treatment plant and support of choosing the process of the technical parts, capacity 100,000 t/a

 
 

 

 

Saubermacher
Dienstleistungs AG

Graz/A
 

Retrofitting of an existing waste splitting plant (capacity of 30,000 t/a), design work, approval planning and handling of the administrative procedure, compilation of specifications, handling of the call for tenders and the award of contracts and supervision till commencement of operations

 
 

 

 

ecorec Slovenska s.r.o.
Pezinok/SK

 

Reconstruction of an existing SRF-treatment plant, feasibility study, handling of the call for tenders and award of contracts, supervision, start-up, capacity 15,000 t/a

 
 

 

 

ecorec Česko s.r.o.
Tremosnice/CZ

 

Reconstruction of an existing SRF-treatment plant, feasibility study, handling of the call for tenders and award of contracts, supervision, start-up

 
 

2004

 

Zuser Umweltservice GmbH
Peggau/A

 

Approval planning and handling of the administrative procedure for the expansion of a waste treatment company, including a scrap wood treatment plant, SRF treatment plant as well as an operation shop and corresponding storage facilities

 
 

 

  KAB Kärntner Abfallbewirtschaftung GmbH Klagenfurt/A   Approval planning according to the Waste Management Act for a dry-mechanical waste treatment plant with a capacity of 34,900 t/a  
 

 

 

Müllex Umweltsäuberungs GmbH
Gleisdorf/A

 

Compilation of specifications, handling of the call for tenders and award of contracts, supervision of construction and assistance till commencement of operations of an SRF treatment plant for 8,000 t/a

 
 

2003

 

AVN
Dürnrohr/A

 

Detailed design work and comparison of several methods for an automatic container discharging facility from the train to the waste bunker of a waste incineration plant with a capacity of 300,000 t/a

 
 

 

 

Ing. Rudolf Rottner GmbH
Fischamend/A

 

Design work and approval planning according to the Waste Management Act, compilation of specifications relating to process engineering, handling of the EU-wide call for tenders and award of contracts, supervision of the construction of a dry-mechanical waste sorting plant including a wind screening plant in order to derive the high caloric light fraction, capacity of 27,000 t/a of commercial and household waste

 
 

 

  ThermoTeam GmbH
Retznei/A
 

Compilation of specifications relating to process engineering, handling of the EU-wide call for tenders and award of contracts, supervision of construction and assistance till commencement of operations of a treatment plant for SRF for use in the cement industry, capacity of 55,000 t/a (licensed for 90,000 t/a)

 
 

 

  Freudenthaler AG
Inzing/A
 

Design work and approval planning according to the Waste Management Act, compilation of specifications relating to process engineering, handling of the call for tenders and award of contracts and supervision of the construction of a dry-mechanical waste sorting plant including a wind screening plant in order to derive the high caloric light fraction, capacity of 17,000 t/a of commercial and household waste

 
 

2002

  UEG Umwelt- und Entsorgungstechnik AG
Neuseiersberg/A
 

Design work and handling of the administrative procedure, compilation of specifications and handling of the award of contracts for the “Recycling Center Eisenerz” featuring a dry-mechanical treatment plant for 40,000 t/a of pre-treated commercial waste and 30,000 t/a of shredder waste (light fraction) in order to derive the high caloric as well as the disposable light fractions

 
 

 

 

Müllex
Umweltsäuberungs-Ges.m.b.H.
Pirching/A

 

Compilation of specifications and handling of the award of contracts, project management and supervision of the construction of a mechanical waste treatment plant for 30,000 t/a

 
 

2001

 

Saubermacher
Dienstleistungs AG

Graz/A
 

Approval planning for an SRF treatment plant for plastic waste, capacity of 8,000 t/a

 
 

 

 

Amand Umwelttechnik Lockwitz
Dresden/GER

 

Approval planning and detailed design work for an SRF treatment plant for 100,000 t/a

 
 

 

 

Zuser Umweltservice GmbH
Peggau/A

 

Approval planning pursuant to the Waste Management Act for a plant location handling 150,000 t/a

 
 

 

 

ThermoTeam
Alternativbrennstoffverwertungs GmbH
Ehrenhausen/A

 

Approval planning for an SRF treatment plant for 90,000 t/a including the design of the necessary logistic facilities for the removal of the produced SRF

 
 

2000

 

Müllex
Umweltsäuberungs-Ges.m.b.H.
Pirching/A

 

Approval planning for a dry-mechanical waste treatment plant with a capacity of 50,000 t/a and integration of existing facilities on a new operating site

 
 

 

 

ZUMA Abfallstoffverwertung
Vienna/A

 

Pre-project including the economic evaluation of a commercial waste sorting plant for 30,000 t/a

 
 

1999

  Planungsgemeinschaft ATM - IKB
Innsbruck/A
  Design of an SRF treatment plant for 100,000 t/a  
 

 

 

Keske Entsorgung GmbH

Braunschweig/GER
 

Handling of the licensing procedure for a reloading station and a recycling center for 120,000 t/a of commercial waste

 
 

 

 

Lobbe MTU GmbH
Tirol/A

 

Handling of the licensing procedure for the construction of a residual waste treatment plant with a capacity of 30,000 t/a

 
 

1998

  Amand Umwelttechnik Lockwitz GmbH/D   Design of a mechanical residual waste treatment plant including the thermal utilization of the high caloric fraction, 85,000 t/a  
 

 

  Koronis S.A. - Envitec für die
Stadt Athen/GR
  Basic and detailed engineering of the RDF treatment and the heavy fraction for the composting of a residual-waste-splitting plant (1,200 t/d) for the region Attika (Athens)
Basic and detailed engineering
 
 

 

 

Lobbe MTU GmbH
Tirol/A

 

Concept for construction of a residual-waste-splitting-plant

 
 

 

 

Prazské Sluzby a.s.
Praha/CZ

 

Engineering of a sorting plant for packaging waste for the city Praha (25,000 t/a)

 
 

1997

 

Stadtreinigung Dresden GmbH/GER

 

Draft engineering of a mechanical residual waste treatment plant at the Radeburger Straße landfill

 
 

 

  Georg Katzlberger Ges.m.b.H. & Co. KG
Mettmach/A
  Approval planning according to §29 AWG for a sorting plant  
 

 

 

Kröpfel Ges.m.b.H.
Attnang-Puchheim/A

 

Adaptation and expansion of existing plants to a residual waste splitting plant

 
 

 

 

RSA GmbH Marienberg/GER

 

Approval planning for a mixed plastic waste sorting plant

 
 

1996

 

Austrian Energy & Environment
Graz/A

  Consultative work and design of the fuel supply system and the intermediate storage in a fluidized – bed boiler (100 MW) for the light fraction  
 

 

 

Loacker Recycling GmbH
Götzis/A

 

Approval planning for a waste management centre

 
 

 

 

Vorwagner GesmbH & CoKG
Pinsdorf/A

 

Approval planning for a sorting plant according to § 29 of the Waste Management Act

 
 

1995

 

AVL Abfallverwertungsges.
des Landkreis Ludwigsburg mbH
Bietingheim-Bissingen/GER

 

Draft engineering for a thermal treatment facility for the light fraction (40 MW)

 
 

 

 

AWE GmbH
Dohna bei Dresden/GER

 

Draft engineering for a plant using the „residual waste splitting-system“ (35,000 t/a), conditioning, Rott, thermal treatment of the light fraction in a paper factory

 
 

 

  Saubermacher Süd d.o.o.
Murska Sobota/Slovenien
  Design of a waste treatment plant and several waste collection centers for the Region of Celje/Slovenia  
 

1994

 

ABRG Abfallbehandlungs-
und Recycling GmbH
Arnoldstein/A

 

Design work and logistic concept for the storage and treatment of anorganic waste in Arnoldstein

 
 

 

  Grüne Tonne
Neunkirchen Ges.m.b.H./A
 

Expansion of an existing sorting plant for dry waste

 
 

 

 

Granuplast Kunststoffverwertung GmbH

Vienna/A
 

Project management and supervision of construction of a plastic recycling plant (15,000 Mg/a)

 
 

1993

 

ard-Asphalt Recycling GmbH
Dresden/GER

 

Engineering of a half-mobile sorting plant for demolition waste (performance: 30,000 t/a) in Dresden

 
 

 

 

ARGE Leithäusl-Katzlberger
Mehrnbach, Mettmach/A

 

Engineering of a sorting plant for packaging material

 
 

 

 

ARW Altstoffrecycling Wien GmbH/A

 

Engineering of a sorting plant for commercial and building waste (40,000 t/a) in Vienna

 
 

 

  Welser Abfallverwertung Ges.m.b.H
Wels/A
  Design of a sorting plant for commercial waste and packaging waste as well as of a shredder plant for residual waste with a capacity of 30,000 t/a  
 

1992

  abr Asphalt-Beton-Recycling GmbH
Riesa/D
 

Engineering of a waste management center including facilities for industrial waste sorting, demolition waste processing, mixed construction waste sorting, used lumber size reduction, sewage sludge drying, power/heat generation, contaminated soil scrubbing at Riesa/Saxony

 
 

 

 

BWG Weiz Baustoff-Wiederverwertungs Ges.m.b.H.
Unterpremstätten/A

 

Engineering of an industrial waste sorting facility (8,500 t/a) for the district of Weiz, Styria

 
 

 

 

Landratsamt Garmisch-Partenkirchen/GER

 

Engineering of an industrial waste sorting and mixed construction waste treatment plant (19,000 t/a) for the rural district of Garmisch Partenkirchen/G

 
 

 

 

Hettegger Sepp & Söhne
Transportunternehmen KG
Schwarzbach in Pongau/A

 

 Engineering of an industrial waste sorting plant and bulky and residual waste treatment facility (13,000 t/a)

 
 

 

 

Welser Abfallverwertung Ges.m.b.H.
Wels/A

 

Preliminary project for a waste management center featuring a sorting plant for industrial waste, a composting plant for biogenic waste, a sorting plant for mixed construction site rubble, a treatment plant for demolition waste, the treatment of contaminated sites and a recycling plant for plastic waste

 
 

1991

  AVL Abfallverwertungsges.
d. LK Ludwigsburg mbH
Bietigheim-Bissingen/D
  Engineering of a recycling park including sorting plants for commercial waste, DSD-light fraction and plastics processing at Benningen  
 

 

 

Kurz Recycling GmbH
Schwaigern/GER

 

Engineering of an industrial waste sorting plant (12,000 t/a) at Schwaigern/LKR Heilbronn

 
 

 

 

Amt der OÖ Landesregierung/A

 

Engineering of a sorting plant (14,000 t/a) handling plastics from recycling yards

 
 

 

 

O.Ö. Landes-Abfallverwertungsunternehmen Ges. m.b.H./A

 

Engineering of a central storehouse with sorting plant and plastics processing plant for material from approx. 100 recycling yards

 
 

1990

 

Burgenländischer Müllverband
Oberpullendorf/A

 

Detail engineering for the reconstruction of all transfer stations

 
 

 

 

Landratsamt
Garmisch Partenkirchen/GER

 

Engineering of recycling yards at Murnau, Mittenwald and Oberammergau

Preliminary project planning for a commercial waste sorting plant at Eschenhohe

 
 

 

 

GWV Gesellschaft
für Wertstoffverwertung mbH
Remseck/GER

 

Engineering of a processing plant for commercial waste, collected materials, demolition waste and mixed construction waste at Remseck

 
 

 

  NGV Nürnberger Gewerbemüll
Verwertung GmbH & Co KG/D
  Design of a commercial waste sorting plant (100,000 t/a)  
 

 

 

Toifelhart Ges.m.b.H.
Vienna/A

 

Design of a processing plant for demolition waste, mixed construction site rubble and leaf and yard wastes (120,000 t/a) in Simmering

 
 

1989

 

AEVG Abfall-Entsorgungs-
u. Verwertungs Ges.m.b.H.
Graz/A

 

Design work for an industrial waste sorting plant (16,000 t/a)

 
 

 

  CANURO für Waste Management Inc.
USA
 

Engineering of a commercial waste sorting plant (2,200 t/a) for Sunnyvale (California, U.S.A.)

Engineering of a sorting plant handling (400 t/a) for Oakland/Michigan, U.S.A.

 
 

 

 

Hubert Häusle
Ges.m.b.H./A

 

Design of a commercial waste sorting plant (35,000 t/a)

 
 

 

 

Schlager Ges.m.b.H.
Graz/A

 

Engineering of a commercial waste sorting plant for 8,000 t/a

 
back to top

Biological waste treatment

2018

 

Fuchsluger GmbH

Aschbach/A
 

Pre-planning and preparation of approval documents according the Waste Treatment Act for a composting plant with a capacity of 9.985 t/a

 
 

 

 

BRM Recycling GmbH

A
 

Re-planning for a composting plant with a capacity of 18.000 t/a

 
 

2017

 

Servus Abfall Dienstleistungs GmbH & CoKG

Graz/A
 

Approval planning and preparation of specifications for the rebuilding of plant components of a MBT in Frohnleiten after a fire, capacity 93,700 t/a

 
 

2016

 

SAB Salzburger Abfallbeseitigung GmbH

Bergheim/A
 

Preliminary planning and cost estimate for waste gas scrubbing to eliminate ammonia from exhaust air of the mechanical biological composting

 
 

 

 

Steirische Umweltservice GmbH

St.Lorenzen im Mürztal/A
 

Assistance during an official environmental inspection
Approval planning according to the Waste Management Act for modifications of a composting plant wit a capacity of 10000 t/a

 
 

2016

 

Servus Abfall Dienstleistungs GmbH & CoKG

Graz/A
 

Approval planning and compilation of specifications for the installation of a dosing bin in the MBT Frohnleiten, capacity 93,700 t/a

 
 

2015

 

Montanuniversität Leoben

Leoben/A
 

Elaboration of measures for the extension of a mechanical-biological waste treatment plant in Croatia, capacity 72,000 t/a

 
 

2014

 

Stockerauer Saubermacher GmbH

Stockerau/A
 

Site investigation for the construction of a compost plant

 
 

2013

 

Holcim (Hrvatska) d.o.o.

Koromacno/CRO
 

Support for the clarification of possible technical adjustments of a mechanical-biological waste treatment plant to achieve the requested fuel quantities

 
 

 

 

Servus Abfall
Dienstleistungs GmbH & CoKG

Graz/A
 

Approval planning according to the Waste Management Act, compilation of specifications, tendering and procurement procedures according the Austrian trade law, construction supervision and commissioning of the reconstruction of the MBA Frohnleiten with a capacity of 76,000 t/a

 
 

2012

 

Abfallwirtschaftsverband Hartberg
Hartberg/A

 

Support for the optimization of a composting at the MBA Hartberg

 
 

 

 

Servus Abfall
Dienstleistungs GmbH & CoKG

Graz/A
 

Preplanning for the reconstruction of the MBA Frohnleiten with a capacity of 76,000 t/a

 
 

 

 

Saubermacher Dienstleistungs AG

Vienna/A
 

Support at the conception of a composting plant with a capacity of 10,000 t/a

 
 

2011

  Ragn-Sells AS
Tallinn/EE
 

Supervision of the construction of a mechanical biological waste treatment plant in Tallinn/Estland with a capacity of 88,500 t/a

 
 

 

 

Ekokem Oy Ab
Riihimäki/FI

 

Compilation of specifications for the fermentation of a fine fraction rich in organic substances gained from residental waste; capacity of 35,000 t/a;
jointly with EnviCare

 
 

 

 

Saubermacher
Slovenija d.o.o.
Murska Sobota/SLO

 

Analysis of possiblities for the construction of a biological treatment plant for the high organic-content fraction from domestic waste with a capacity of 30,000 t/a;

jointly with EnviCare
 
 

 

 

SAB Salzburger Abfallbeseitigung GmbH
Bergheim/A

 

Pre-design, approval planning according to the Waste Management Act, compilation of specifications, tendering and procurement procedures according the Austrian trade law, construction supervision and commissioning of the conversion of Lane 3 of the mechanical biological residual waste treatment plant with an overall capacity of 154,000 t/a

 
 

2010

  Ragn-Sells AS
Tallinn/Estonia
  Verification of implementation planning of a supplier for the construction of a mechanical biological waste treatment plant in Tallinn/Estonia with a capacity of 80,000 t/a  
 
    Saubermacher Dienstleistungs AG
Graz/A
  Verification of implementation planning of a supplier for the construction of a mechanical biological waste treatment plant in Varna/Bulgaria with a capacity of 140,000 t/a  
 

2009

  Abfallwirtschaftsverband Liezen
Liezen/A
 

Pre-design, draft planning, compilation of specification and handling of the award of contracts of an extension of the conveying system with the capacity of 16 t/h of a mechanical-biological waste treatment plant

 
 

2008

  ZEMKA Ges.m.b.H.
Zell am See/A
 

Pre-design and approval planning according to the Austrian Waste Management Act, compilation of specification and handling of the EU-wide call for tenders and construction supervision for an upgrading of the mechanical treatment of the mechanical-biological waste treatment plant of the company ZEMKA, capacity 61,300 t/a

 
 

2007

 

Abfallwirtschaftsverband Liezen
Liezen/A

 

Approval planning according to the Waste Management Act for a mechanical biological waste treatment plant with a capacity 25,000 t/a and a composting plant with a capacity 6,000 t/a

 
 

 

  RSVG Reststoffvertriebs GmbH
Eisenerz/A
  Pre-design and approval planning according to Waste Management Act for the upgrading of a biological waste treatment plant according to the state of the art  
 

2005

 

Abfallwirtschaftsverband Liezen
Liezen/A

 

Pre-design and approval planning according to the Waste Management Act,  compilation of specifications, handling of the call for tenders and construction supervision for an upgrading of an existing mechanical-biological waste treatment plant with secondary shredder, capacity 14 t/h

 
 

 

  Servus Abfall Dienstleistungs GmbH & Co KG
Graz/A
 

Final approval procedure according to the Austrian law of environmental impact assessment of the mechanical-biological waste treatment plant Frohnleiten, capacity 65,000 t/a

 
 

 

 

UEG International Holding GmbH
Neuseiersberg/A

 

Pre-design, compilation of specifications, handling of the call for tenders and award of contracts of an anaerobic fermentation plant on Corfu/Greek for 90,000 t/a municipal waste, 5,000 t/a sewage sludge, 20,000 t/a of olive marc and other waste

 
 

2004

 

Servus Abfall
Dienstleistungs GmbH&CoKG

Graz/A
  Design of a mechanical-biological waste treatment plant with a capacity of 17,000 t/a in Lavant/East Tyrol  
 

 

 

SAB Salzburger
Abfallbeseitigung GmbH
Bergheim/A

 

Compilation of specifications relating to conveyor facilities, handling of the EU-wide call for tenders and award of contracts, supervision of construction and assistance till commencement of operations of a mechanical-biological residual waste treatment plant with a capacity of 154,000 t/a

 
 

2003

  Servus Abfall
Dienstleistungs GmbH&CoKG
Graz/A
  Compilation of specifications, handling of the call for tenders and award of contracts, project management and supervision of the construction of a mechanical biological residual waste treatment plant for 65,000 t/a  
 

 

 

Abfallwirtschaftsverband Liezen
Liezen/A

 

Design work and approval planning according to the Waste Management Act, compilation of specifications relating to process engineering, handling of the EU-wide call for tenders and award of contracts, supervision of the construction of a mechanical-biological residual waste treatment plant for 25,000 t/a and a bio waste composting plant for 6,000 t/a;
In cooperation with Dr. Schippinger & Partner and Envicare

 
 

2002

  SAB Salzburger Abfallbeseitigung GmbH
Bergheim/A
 

Design work and approval planning according to the Waste Management Act for a mechanical-biological residual waste treatment plant with a capacity 154,000 t/a

 
 

 

 

Georg Katzlberger GesmbH & Co KG
Mettmach/A

 

Pre-design for a mechanical-biological residual waste treatment plant for 25,000 t/a

 
 

2001

 

NUA Niederösterreichische Umweltschutzanstalt / AVN Abfallverwertung NÖ Ges.m.b.H.

Maria Enzersdorf/A
 

Pre-design of several methods concerning the mechanical-biological treatment of residual waste

 
 

 

  Gemeindebetriebe Frohnleiten GmbH
Frohnleiten/A
  Design work and handling of a licensing procedure pursuant to the Environmental Impact Assessment Act for a mechanical-biological residual waste treatment plant with a capacity of 97,500 t/a  
 

2000

  Saubermacher Süd
Murska Sobota / SLO
  Pre-project for a mechanical-biological treatment plant for household waste, industrial waste and bulky waste with a capacity of 67,000 t/a  
 

 

  AVG Steirische Abfallverwertungs G.m.b.H.
Graz/A
  Pre-engineering for a biological residual waste treatment plant for 36,000 t/a  
 

1999

  Koronis - Envitec S.A. für die Region Attika/GR   RDF treatment and composting of the heavy fraction for the residual-waste splitting plant (1,200 t/day) for the region of Attika (Athens); basic and detailed design work  
 

 

 

RSVG Reststoffvertriebs GmbH
Ohlsdorf/A

 

Design work and assistance in the award of contracts for an exhaust air registration and treatment system in a composting plant

 
 

 

 

Zellinger GmbH
Walding/A

 

Pre-design of a mechanical-biological residual waste treatment plant

 
 

1998

 

GEMES GmbH
Unterwellenborn/GER

 

Pre-design, detail engineering, tendering, management until commencement of operations on a composting plant for 80,000 t/a

 
 

1997

  AEVG Abfall-Entsorgungs-
u. Verarbeitungs Ges.m.b.H
Graz/A
 

Installation of a bio-waste treatment unit in an existing plant

Design of a yard trimmings crushing plant

Expansion of the delivery position for private cars

 
 

 

  GEMES GmbH
Schöngleina/D
  Detail engineering, tendering, management until commencement of operations on a composting plant for 60,000 t/a  
 

1996

  Stadt Chemnitz
Chemnitz/D
  Basic research, preliminary and draft planning of a mechanic-biological plant at the Weißer Weg landfill for 80,000 t/a  
 

 

 

GEMES GmbH
Schöngleina/GER

 

Engineering of a composting plant (treatment and intensive - rott) using the Rott - filter process

 
 

1994

  ISEO Restmüll GmbH
Bretten/D
 

Engineering of a conditioning and rotting facility (35,000 t/a) using the „RESIDUAL WASTE - SPLITTING - METHOD“

 
 

 

  AWV Schladming
Schladming/A
  Engineering and supervision of the expansion of a waste-sludge-composting plant  
 

1993

  GWV Gesellschaft für
Wertstoffverwertung mbH
Remseck/D
  Engineering of the enlargement of a biowaste-composting plant using the rott-filter-process in Korntal-Münchingen, district of Ludwigsburg (performance: up to 6,500 t/a)
jointly with AWIPLAN
 
 

1992

  Bezirksabfallverband Freistadt/A   Engineering of a residual waste treatment and rotting facility (7,000 t/a) for the district of Freistadt/Upper Austria
jointly with Ziv.Ing. J.Ringhofer
 
 

 

 

Saubermacher
Dienstleistungs GmbH
Graz/A

 

Engineering of a composting plant using the Rott-filter process for 1,200 t/a bio waste in Lannach/Styria

Engineering of a composting plant (4,000 t/a) for bio waste using the Rott - filter process in Voitsberg

 
 

1991

  Stadtwerke Fürstenfeld Ges.m.b.H./A   Engineering of a bio-waste composting facility (1,100 t/a) using the rott-filter process at Fürstenfeld/Styria  
 

 

  GWV Gesellschaft für
Wertstoffverwertung mbH
Remseck/D
  Engineering of a bio-waste composting plant (4,000 t/a) using the rott-filter process at Korntal-Münchingen  
 

 

  Müllex
Umwelt- und Säuberungs Ges.m.b.H.+Co KG
Markt Hartmannsdorf/A
  Engineering of a bio-waste composting plant (1,500 t/a) using the rott-filter process at Markt Hartmannsdorf/Styria  
 

1990

  GWV Gesellschaft für
Wertstoffverwertung mbH
Remseck/D
  Engineering of a composting plant for the rural district of Ludwigsburg (6,000 t/a) in Marbach  
 

 

 

Abfallverband Kaiserwinkl
Kössen/A

 

Engineering of a composting plant unsing the Rott-Filter-Process for 800 Mg/a of biological waste

 
 

 

 

Schauerhuber Ges.m.b.H.
Absdorf/A

 

Engineering of a mobile composting plant using the Rott - Filter Process for biological waste

 
 

1989

 

Austria Systemmüll Gesellschaft m.b.H.
Vienna/A

 

Design work for a standard dry waste  processing plant and a composting plant for organic waste

 
 

 

  City of Guelph/CAN   Design of a dry waste sorting plant and a composting plant for BIO-BIN material (100,000 t/a)
In cooperation with R.Cave & Ass. Ltd.
 
 

 

 

Toifelhart Ges.m.b.H.
Vienna/A

 

Engineering of a compost plant refuse from cemeteries and biological waste from separate collections (50,000 t/a)

 
back to top

Landfills and waste storages

2018

 

Entsorgungs-Service GmbH

Krems/A
 

Preparation of documents according Seveso III directive for a chemical-physical treatment plant for organic waste (CPO) and an interim storage facility for hazardous waste

 
 

 

 

Stadtgemeinde Deutschlandsberg

Deutschlandsberg/A
 

Preparation of approval documents for a recycling and hazardous waste collection center with troughput of 9.000 t/a

 
 

2017

 

Abfallwirtschaftsverband

Neunkirchen/A
 

Preliminary planning and variant analysis for waste material collection centers in Neunkirchen

 
 

 

 

Stockerauer Dienstleistungs GmbH

Stockerau/A
 

Approval planning according to the Waste Management Act for a used material and hazardous waste collection center and a waste transfer station

 
 

2016

 

SAB Salzburger Abfallbeseitigung GmbH

Bergheim/A
 

Preliminary planning and cost estimation for a construction landfill wit a filling volume of 360000m3

 
 

 

 

Hans Zöchling GmbH

Hainfeld/A
 

Support in the administrative procedure for the classification of waste at a landfill regarding the Seveso III Directive of the EU

 
 

2015

 

Saubermacher Dienstleistungs AG

Wien/A
 

Elaboration of documents in an approval process for a storage facility for hazardous and non-hazardous waste. Assessment of the classification according to Seveso III EU Directive, max. storage capacity 10,000 t

 
 

 

 

Marktgemeinde Oberalm

Oberalm/A
 

Design planning for the redesign of the recycling centre

 
 

2014

 

Mürzverband

Kapfenberg/A
 

Design planning for the construction of a recycling center and a transfer station for residual waste, organic waste, scrap metal and scrap wood

 
 

 

 

Holding Graz Services Abteilung Abfall

Graz/A
 

Adaptation planning of a recycling center for the city of Graz

 
 

 

 

SAB Salzburger Abfallbeseitigung GmbH

Bergheim/A
 

Extension of approval of an interim storage for hazardous

waste (contaminated soils)
 
 

2013

 

TGL Tauerngasleitung GmbH

Wals-Siezenheim/A
  Planning a-soil excavation landfill for 500,000 m³ as part of the EIA process for the construction for the „Tauerngasleitung”  
 

 

 

Remondis Austria GmbH Wien/A

  Approval planning according to the Waste Management Act for changing the capacity of hazardous waste  
 

2012

 

ARGE Bauschuttauffüllung und Wiederverwertung
Villach/A

  Monitoring of a landfill containing construction waste according to the decision of the provincial government in Carinthia (in progress since 1993)  
 

2010

 

Remondis
Vienna/A

 

Approval planning according to the Austrian Waste Management Act for the expansion of a storage facility for hazardous wastes

 
 

2009

  WSA Waste Service GmbH
Hartberg/A
  Approval planning according to the Austrian Waste Management Act for the relocation and the extansion of an intermediate storage of hazardous wastes with a capacity of 16,000 t/a in Hartberg  
 
    KAB Kärntner Abfallbewirtschaftung GmbH
Klagenfurt/A
 

Approval planning according to the Austrian Waste Management Act for refilling of a loam pit with capacity of 103,000 m³

 
 
    Mayr-Melnhof Karton Ges.m.b.H.
Hirschwang/A
  Technical concept of adaption to the state of the art of the company landfill for residual materials  
 

2008

  Remondis Austria GmbH
Vienna/A
  Pre-design and draft planning for the integration of an intermediate storage of hazardous wastes in an existing plant, storage capacity 272 t  
 

2007

  WSA Waste Service GmbH
Hartberg/A
  Approval planning according to the Austrian Waste Management Act for an intermediate storage and physical treatment of hazardous waste, capacity 16,000 t/a  
 

 

 

Trans-Beton Lieferbeton GesmbH
Bruck an der Mur/A

 

Approval planning for the construction of an intermediate storage of high caloric value wastes in Feldbach, capacity 8,000 t

 
 

 

 

Abfallwirtschaftsverband Lavanttal
Lavamünd/A

 

Feasibility study for possibilities concerning the extension of the landfill Hart, approval planning according to the Waste Management Act

Design of a recyclable material collection center

 
 

2006

  KAB Kärntner
Abfallbewirtschaftung GmbH
Klagenfurt/A
  Approval procedure for temporary storage facilities for hazardous waste with a capacity of 5,000 t/a  
 

2004

  SAB Salzburger
Abfallbeseitigung GmbH
Bergheim/A
  Approval planning and handling of the administrative procedure for a mass waste landfill in order to adapt the existing landfill to the requirements of the new Landfill Act  
 

 

  Saubermacher
Dienstleistungs AG
Graz/A
  Approval planning and handling of the administrative procedure for the construction of an intermediate storage facility with a storage capacity of 8,000 t/a  
 

2002

  Georg Katzlberger GesmbH & Co KG
Mettmach/A
  Approval planning for a storage facility for hazardous waste and its physical treatment, capacity of 5,000 t/a  
 

2001

 

Deponie Fellach

Villach/A
 

Technical expert study on landfilled waste according to ALSAG-standards

 
 

 

  O.W.R.C., Teheran/Iran   Consulting work and engineering for the retrofitting of the Kahrizak landfill  
 

 

  Studio Tedesi – Deponie Piemont
Maleo/I
  Consulting work and concept for the sanitation of a landfill for domestic and commercial waste  
 

 

  Schlager GmbH, Graz/A   Approval planning and handling of the administrative procedure according to the Waste Management Act for a dump for construction site rubble with a capacity of 185,000 m³  
 

2000

  Afvalzorg Deponie BV
Haarlem/NL
  Concept, design, supervision and start-up of a landfill reclamation project by means of an aerobisation of the waste layers and emission control  
 

1999

 

Abfallwirtschafstverband Wolfsberg
Wolfsberg/A

 

Final report on landfill stabilization (relocation of the landfill at the same site)

 
 

 

  Abfallwirtschaftsverband Chemnitz/D  

Evaluation of an experiment on gas extraction and overall assessment of the landfill gas situation on the landfill Markersdorf;
In cooperation with RUK

Inspection of a degassing plant and of gauging instruments in the course of an experiment on gas extraction on the landfill Markersdorf;

In cooperation with RUK
 
 

1998

  ARGE Bauschuttauffüllung und Wiederwertung Villach/A   Concept and calculation of economic efficiency to update the landfill with the latest state of the art  
 

 

 

Abfallwirtschaftsverband Chemnitz/D

 

Execution of the project schedule, placing, supervision and project support for the construction of an active site digestion gas collection and landfill gas extraction of the landfill Falkenau;

together with RUK
 
 

1995

 

Landkreis Freiberg/Sachsen/D

 

Reconversion of the sanitary landfill Muldenhütte

 
 

 

  Gerosan GmbH
Ludwigsburg/D
 

Detail engineering of a treatment plant to reconverse the sanitary landfill Burghof

Design of a soil mixing plant in Ludwigsburg/D

 
 

1994

 

AVL Abfallverwertungsges.
d. LK Ludwigsburg mbH
Bietigheim-Bissingen/D

 

Dynamic concept to fill up the Burghof landfill

Engineering of the enlargement of the landfill mining plant at the Burghof landfill

 
 

 

  Abfallwirtschaftsverband Schladming/A   Reconversion of the sanitary landfill Aich Assach/A  
 

 

  AVL Abfallverwertungsges.
d. Landkreis Ludwigsburg mbH
Bietigheim-Bissingen/D
  Supervision of construction at the “Froschgraben” landfill for soil and demolition waste  
 

1993

 

Republic of Austria,
Bezirkshauptmannschaft Wiener Neustadt/A

  Concept on reclamation of “Berger” landfill site at Weikersdorf;
in cooperation with Ziv.Ing. J.Ringhofer and Dr. Meyer
 
 

1992

  AVL Abfallverwertungsges.
d. LK Ludwigsburg mbH
Bietigheim-Bissingen/D
  Project: the implementation of a demonstration project for site remediation by excavation, sifting and sorting  
back to top

Industrial facilities

2018

 

Bage plastics GmbH

St.Marien/A
 

Preparation of approval documents for the construction of a storage hall and plant modifications

Coordination of additional specialist planners and supervision of approval procedures

 
 

2017

 

Komex Abfallentsorgungs-gesellschaft m.b.H.

Voitsberg/A
 

Approval planning according to commercial law for the takeover of additional waste types

 
 

2016

 

bage plastics GmbH

St. Marien/A
 

Supervision of the administrative procedure for a plant extension. Concept for the creation of a logistics site, preparation of submission documents and support of the approval procedure.

 
 

2016

 

Schaufler GmbH

Ybbs/A
 

Survey of the surface drainage at a plant for storage of scrap metal
Evaluation of dewatering regarding the state-of-the-art

 
 

 

 

Wiener Hafen, GmbH & Co KG

Wien/A
 

Comparison of variants of conveyor systems for the trimodal bulk handling in a bulk material storage on behalf of schneider-consult Ziviltechniker GmbH

 
 

2015

 

Greenlife Ressourcen GmbH

Hartberg/A
 

Approval planning according to commercial law for a pyrolysis plant for carbonization of sewage sludge to bio-coal

 
 

 

 

OKV Kunststoff-Verwertung GmbH

Zwentendorf/A
 

Preparation of permitting documents for the new construction of 3 granulating plants and a baler. Supervision from approval procedure to permission

Supervision of the official procedures to change from commercial law to Waste Management Act-regime

 
 

 

 

Manfred Arzbacher Ges.m.b.H.

Schladming/A
 

Elaboration of a site concept, preparation of submission documents, support  administrative prodeedings for the submission of a new site

Storage, presorting, sorting and handling of varoius waste streames (bulk materials to hazardous waste) including all necessary structural and infrastructural facilities

 
 

2014

 

Buchhauser GmbH

Voitsberg/A
 

Preparation of submission documents for the construction of a storage of hazardous waste

 
 

 

 

Montanuniversität Leoben

Leoben/A
 

Preparation of submission documents for the workplace permission according to law for the construction of laboratories

 
 

 

 

OKV Kunststoffverwertung GmbH

Zwentendorf/A
 

Preparation of approval documents to build and operate a granulating plant

 
 

2012

 

Retter & Partner ZT GmbH

Krems/A
 

Conception to construct a feed storage section with automatic input and loading by truck, train or ship.
Capacity approximately 14.000 m³

 
 

 

 

Wiener Hafen GmbH & Co KG
Vienna/A

 

Approval planning, compilation of specification and construction supervision for a train loading chute with conveyors to deposit salt; Throughput: 2 x 200 m³/h

 
 

 

 

Cleanaway Österreich GmbH
Wörgl/A

 

Elaboration of permitting documents according to the Austrian Commercial Law for plant modifications at 5 locations in Austria  

 
 

2011

 

Wiener Hafen, GmbH&CoKG
Vienna/A

 

Pre-design and approval planning, compilation of specifications, handling of the call for tenders and the procurement procedures for a conveyor- and storage system for salt with a capacity
of 20,000 m³ and a throughput capacity of 200 t/h

 
 

 

 

Retter & Partner

Krems/A
  Conceptual design for the construction of a storage facility including the automatic loading and unloading onto/from ships, trains and trucks  
 

2010

 

ALUmelt GmbH
Eisenerz/A

 

Approval planning for the construction of a remelting plant for secondary aluminium and associated facilities with an overall capacity of 142,500 t/a

 
 

2008

  OKV Kunststoffverwertung GmbH
Zwentendorf/A
  Approval planning according to the Austrian Commercial Law for the construction of a storage hall and adaptions of an existing operating plant  
 
    ZUMA Beteiligungs GmbH & Co
Abfallstoffverwertungs KG
Vienna/A
  Pre-design and approval planning according to the Austrian Commercial Act for taking-over and storage of wastes and demolition and construction materials, capacity 197,000 t/a  
 
   

INKU AG
Klosterneuburg/A

 

Approval planning according to the Austrian Industrial Act for the installation of a storage container for combustible liquids

 
 

2007

 

Zuser Umweltservice GmbH
Peggau/A

 

Approval planning according to the Waste Management Act for the construction of wells for extinguishing water, a feeder track and a location for the operational fire brigade

 
 

2006

  Wiener Hafen GmbH&CoKG
Vienna/A
  Pre-design and approval planning, compilation of specifications, handling of the call for tenders, award of contracts and supervision of construction for a conveying and storage system for salt with a capacity of 200 t/h  
 

2005

 

Peter Palecek
Stockerau/A

 

Approval procedure of a noise barrier

 
 

2003

  Schukra Berndorf GmbH
Berndorf/A
 

Assessment of the current administrative situation concerning licensing procedures, approval planning according to the Industrial Code and the building laws, optimization of the fire precaution plan for a plant location of the automotive industry

 
 

2002

  Parsons Brinckerhoff Ltd (London) /
Reichhold International
Vienna /A
 

Evaluation of the safety and eco-management and its implementation according to IPPC-standards

 
 

2000

  Katzlberger GesmbH & Co KG
Mettmach/A
  Handling of the licensing procedure for the construction of a waste wood – fired plant with a nominal heat output of 850 KW including a flue gas cleaning system using additives  
 

 

  Quarzsand Ravensburg
Ravensburg/D
  Licensing procedure according to the mining law for quartz sand recovery; pilot survey and approval planning  
 

 

  W.Hamburger AG, Pitten/A   Handling of the inspection according to § 82 b of a paper mill  
 

 

 

Paul & Co GmbH
Breitenau/A

  Handling of the inspection according to 82 b of a paper mill  
 

1999

  WCI - Woodward-Clyde International
London/GB
  Evaluation of the company’s environmental protection policy and safety in a company producing chemicals  
 

 

 

Zuser Umwelttechnik GesmbH
Peggau/A

 

Rehabilitation concept pursuant to the Industrial Code for the adaptation of a plant location handling a capacity of 150,000 t/a

 
 

1998

 

Stadtreinigung Dresden GmbH
Dresden/D

 

Licensing procedure for a waste container washing plant and a washing facility fo rbiological waste collection vehicles

 
 

 

 

P & N Kiesgewinnung GmbH
Neudorf/A

 

Approval with regards of water laws for wet processing of gravel

 
 
back to top